KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Some assembly required
' style=
Date:  5-22-2015
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Z-brackets

I deburred the z-brackets drilled one center hole and drilled them to the to main spar.
The procedure was as I did for the left wing, i.e. I deviated from the plan and followed the method many other builders choose in order to get more space for the pull rivet (when riveting to the fuel tank baffle).

After getting all holes drilled, I drilled the nut plates to the z-brackets and countersunk for the nutplate rivets.
' style=

Checking for tool access

Checking for tool access

' style=

Putting off centerline

Putting off centerline

' style=

Transferring location

Transferring location

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.