Adjusted the flanges on the leading edge. Some of them did not hug the skin properly. Used the opportunity to drill the missing holes with #41 drill bit.
Deburred the edges on the leading edge.
Clecoed on the top skins, leading edge and bottom skin to check the fit.
Match drilled the leading edge ribs and the leading edge skin to the spar.