KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Some assembly required
' style=
Date:  5-7-2015
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Tank joint plate

Put the last leading edge rib into position with the splice plate to prepare for match drilling.

Drilled the rib to the main spar.

Thinking of using a steel blade between the joint plate and the rib to stop the drill bit to reach the rib. Then when the rib can been seen through the skin and joint plate it would be easy to line up the rib (by having a line drawn on the flange).
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.