Powered By Kitlog Pro v2.0
RV-7 Some assembly required
RV-7
Empennage
5-31-2018
< Previous Log Entry
Next Log Entry >
Date:
5-31-2018
Number of Hours:
1.00
Manual Reference:
Brief Description:
Elevator fairings
Another multi part day. I glassed in the left elevator fairing. Build up the right elevator fairing and added aluminum strips to the HS fairing. That is also the first picture of the closed in HS fairing the slight bow in it.
Left elevator closing
Right elevator build up
HS metal strips
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-7 Home
Category
# Logs
# Hours
All
984
2084
Avionics
27
40
Empennage
122
300
Engine
4
19
Finishing
103
211
Firewall Forward
20
28
Fuselage
392
782
Miscellaneous
10
13
None
1
Practice
4
6
Shop Supplies
8
14
Training
2
16
Wings
275
627
Workshop
8
14
Workshop and Supplie
8
14
Copyright © 2001-2024 Matronics. All Rights Reserved.