Brief Description: Fitting the HS 1 - Clamping in place
I did deviate slightly from the building manual. My first step of the HS drilling was to clamp the HS in place with the spacers in place, Vans want you to do it without spacers first and then slip them on and match drill, I think.
I made sure the angle of incidence was 0 deg. by inserting steel rods in the tooling holes and measure their distance down to the aft deck. I also checked the distance to the firewall was equal on each side by measuring from the same two rivets on each side.
Everything was clamped down, I was ready to drill holes.