Powered By Kitlog Pro v2.0
RV-7 Some assembly required
RV-7
Empennage
9-12-2013
< Previous Log Entry
Next Log Entry >
Date:
9-12-2013
Number of Hours:
2.00
Manual Reference:
HS-603PP
Brief Description:
HS-603PP
After practicing for a couple of weeks on scrap, I felt ready to start on the real stuff.
I smoothed of one of the HS-603PP (edges and tapering of the ends). There were some dings and deep scratches that I have to ask Vans about.
Before after
Tapering
Scratches and dings
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-7 Home
Category
# Logs
# Hours
All
984
2084
Avionics
27
40
Empennage
122
300
Engine
4
19
Finishing
103
211
Firewall Forward
20
28
Fuselage
392
782
Miscellaneous
10
13
None
1
Practice
4
6
Shop Supplies
8
14
Training
2
16
Wings
275
627
Workshop
8
14
Workshop and Supplie
8
14
Copyright © 2001-2024 Matronics. All Rights Reserved.