KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Some assembly required
' style=
Date:  8-10-2017
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Final prep before Sikaflex day

Spent more time testing out clamping and positioning techniques. Adding a stop block behind the plexi assures the longitudinal position. I made matching alignment lines on the sides and added the final masking for the Sikaflex. The masking is in several layers so that when I smooth the sika with my finger, I can remove one layer of tape and the excess sika.

I finished the day with paining the glare shield matt black.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.