KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Some assembly required
' style=
Date:  5-28-2017
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Filling the canopy gaps step 2

I sliced the play doh at the middle and measured the thickness required to fill the void. Some areas was above 0.2 inches, it also varied a bit along the rivet line.
I started making spacer of various cut-offs from earlier in the building periods. Angles, block anything I could find that had approximate the thickness I needed. All aircraft grade of course.

I used a plane sander to fine-tune the dimensions.
' style=

Reveal and measure

Reveal and measure

' style=

Reference for spacers

Reference for spacers

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.