KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Some assembly required
' style=
Date:  3-18-2017
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Drilled the canopy frame

Started with drilling the splice plate for the canopy frame sides. Proceeded to drill the canopy sides to the canopy frame.

Next up is splicing the two halves.
A splice plate is used to join the two cabin frame halves. In addition I also made an exact replica of the splice plate. The drilling of both to one side then allows to positioning the undrilled half and drilling it to the splice plate(s).

Ended a long day by manufacturing the C-723 wedge spacer.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.