KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Some assembly required
' style=
Date:  10-8-2016
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Tunnel cover

Measured and drilled the tunnel cover components and the flap actuator and bearing block.
' style=

Tunnel cover

Tunnel cover

' style=

Bearing block

Bearing block

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.