Powered By Kitlog Pro v2.0
RV-7 Some assembly required
RV-7
All
10-23-2016
< Previous Log Entry
Next Log Entry >
Date:
10-23-2016
Number of Hours:
1.50
Manual Reference:
Brief Description:
Right floor riveting
Vacuumed out all the crap of the fuselage and riveted on the right floor. Fitted the remaining side panels with clecos, no point using screws until first flight. Cannot rivet the left until the AHRS bracket is riveted.
Close up
Overview
Panels clecoed on
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
RV-7 Home
Category
# Logs
# Hours
All
984
2084
Avionics
27
40
Empennage
122
300
Engine
4
19
Finishing
103
211
Firewall Forward
20
28
Fuselage
392
782
Miscellaneous
10
13
None
1
Practice
4
6
Shop Supplies
8
14
Training
2
16
Wings
275
627
Workshop
8
14
Workshop and Supplie
8
14
Copyright © 2001-2024 Matronics. All Rights Reserved.