KitLog pro

Powered By Kitlog Pro v2.0

Terrences Web Site
' style=
Date:  3-19-2008
Number of Hours:  4.00
Manual Reference:  N/A
Brief Description:  Begin build of gascolator mount channel

1. Cut .025 blanks, 90 x 200-mm., See Fig. 1.

2. Bend at 22-mm from each end, giving web width of 157-mm as was done for the pump channel.

3. Cut 61-mm diameter hole with fly cutter.

4. Drill 3/16" holes in gascolator tabs for

4. File notches in in the forward and reaward edges of the hole to clear the bowl bale so that the bowl can be removed for maintenance.

5. Cut the L-angle reinforcements to length.

6. Drill & cleco the L-angles.

7. Cut notches into the L-angle to clear the bale.

8. Deburr, scour, and prime the parts.
' style=

Design drawing

Design drawing

' style=

Channel & fly cutter

Channel & fly cutter

' style=

Gascolator clecoed to  channel

Gascolator clecoed to channel

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.