KitLog pro

Powered By Kitlog Pro v2.0

Terrences Web Site
' style=
Date:  8-21-2007
Number of Hours:  1.00
Manual Reference:  6T2A 4
Brief Description:  Deburr & scour the stab skin

1. I removed the stab skin from the skeleton.

2. I deburred the rivet hole in the skin with a flat file.

3. I deburred the front attachment cutouts with an Avery swivel deburr tool.

4. I deburred the holes in the spars and ribs with a flat file and/or a 0.5" drill bit.

5. I scoured the bottom joint areas of the skin and skeleton with 7047 ScotchBrite.

6. I talked to Caleb at ZAC to see if I was supposed to prime the top joint areas of the skin and skeleton before or after I drilled and deburred the top joints. Caleb didn't think the sequence was important, so I decided to prime after I drill and deburr.
' style=

Caleb

Caleb

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.