4 Install the airspeed indicator and altimeter using the fitting provided ( these fitting are pat off the instrument panel.
5 Complete the tubing and the connections using the schedmatic figure.
STATIC PORT INSTALLATION
1 Drill a 1/4 hole trough the fusalage at the determined location..
2 From inside the fusalage , open up the hold to approx 2 " diamenter, ONLY.
3 Create a 1/4 fillet with flox at the perimeter of th de-cored area.
4Lay up6 plies of carbon bid staggerd 1" for every 2 plies. T he first set of plies extend 1" past the edge off the core.
5 Redrill the 1/4 hole aftr the layup has cured.
6 bond the static port (9397) in position with epoxy/flox. Adjust the position of the port so the opening is flush with the fusalage or extend past to be ground flush later.
7 Using micro , creat a radius along the length of the tubeing from the static portto the bottom of the fusalage. Then cover the tubing withcarbon layup.
8 Connect the static port to the appropriate instrument using the 44P poly flo tubing.