KitLog pro

Powered By Kitlog Pro v2.0

DAVID'S WEB SITE
' style=
Date:  4-7-2016
Number of Hours:  4.00
Manual Reference:  19.2.E
Brief Description:  DC CONTROL

INSTALL THE DC CONTROL ON THE FLOOR OF THE FUSALAGE BETWEEN THE FORWARD AND AFT SHEARBOXES.

1 Position the DC control approximately 2 " forward and on the right side of the left passthrough. Ensurenthe module doew not interfere with ny aircraft systems or components.

2 Attach the DC control to the aircraft using stud mounts, washers, and nuts.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.