1 Align the four flanges on the condenser with the previously created mounting flanges on the condenser plenum.
2 Uing a 3/16 or #12 drill bit mtch drill through the condenser flange and the mounting flange. One hole per condenser flange.
3 Apply a generous bead of silicone sealant between the condenser and the condenser planum.
4 Attch the conderser to the plenum using bolts ( AN3-21A or AN3-22A) as required washer ( AN960-10) , spacers appor 1 5/8 long cut from 6061t6 aluminum tubing and locknuts ( AN365-1032A)