KitLog pro

Powered By Kitlog Pro v2.0

DAVID'S WEB SITE
' style=
Date:  4-1-2016
Number of Hours:  2.00
Manual Reference:  15.2.E
Brief Description:  DOOR POWER CONTRACTS

POWER FO RTHE DOOR SEAL PUMP AND OPERTION OF THE DOOR OPEN/DOOR CLOSED SENSOR IS PROVIDED TO EACH DOOR THROUGH THE DOOR POWER CONTACTS. ONE HALF OF THE CONTACTS MUST BE INSTALLED IN THE DOOR AND THE OTHER HALF MUST BE INSTALLED IN THE FUSELAGE. THE CONTRACTS FOR THE MAIN DOOR AND THE BAGGAGE DOOR ARE PROVIDED AS PART OF WIRING HARNESS 401-0083, HARNESS, CABIN DOOR AND BAGGAGE DOOR.

STEPS:

1. CUT A HOLE IN THE FUSELAGE CENTERED BETWEEN THE DOOR HINGE JOGGLES. VERIFY THE DIMENSIONS SHOWN WITH THE BACK OF THE CONTACTS BEFORE CUTTING THE HOLES.

2. MAKE NOTE OF THE WHITE MARK OR THE BLACK WIRE ON THE BACK OF THE CONTACT. THEY MUST LINE UP WITH THE CORRESPONDING MARK OR BLACK WITE ON THE CONTACT TO BE INSTALLED IN THE DOOR.

3. INSERT THE CONTACTS INTO THE HOLE SO THE WIRING IS INSIDE THE CABIN.

4. MATCH DRILL THE CONTACTS TO THE FUSELAGE AND INSTALL USING SCREWS, WASHERS, AND NUTS.

5. CUT A HOLE IN THE DOOR, CENTERED BETWEEN THE DOOR HIINGE JOGGLES. VERIFY THE DIMENSIONS SHOWN WITH THE BACK OF THE CONTACTS BEFORE CUTTING THE HOLE.

6. INSERT THE CONTACTS INTO THE HOLE SO THEY MATCH WITH THE CONTACTS IN THE FUSELAGE. ENSURE THE WHITE MARK OR BLACK WIRE ON THE BACK OF THE CONTACTS LINE UP WITH THE WHITE MARK OR BLACK WIRE ON THE CONTACTS IN THE FUSELAGE.

7. MATCH DRILL THE CONTACTS.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.