KitLog pro

Powered By Kitlog Pro v2.0

DAVID'S WEB SITE
' style=
Date:  2-23-2016
Number of Hours:  2.00
Manual Reference:  11.2.G
Brief Description:  THERMO RELIEF VALVE

THE THERMO RELIEF VAVLE IS INSTALL IN THE HIGH PRESSURE LINE BETWEEN THE ACCUMULATOR AND THE AFT MANIFOLD.

1 INSTALL THE THERM RELIEF VAVLE WHEN THE PIPING FROM THE ACCUMULATOR TO THE AFT MANIFOLD IS INSTALLED.

2 MAKE A PLATFORM OUT OF PHEMOLIC. 8 BID GLASS, 08 G-10 OR 8 BID CARBON LAYUP, WHICH TO MOUNT THE THERMO RELIEF VAVLE.

3 PLACE ADEL CLAMPS AROUND THE THERMO RELIEF VALVE AND MATCH DRILL TWO HOLES THROUGH THE PLATFORM TO ACCEPT THE SCREWS FOR THE CLAMPS.

4 MOUNT THE SCREWS TO THE PLATFORM

5 BOND THE PLATFORM TO THE FUSALGE USING FLOX

6 ATTACH THE PIPIG CONNECTING THE VLVE BETWEEN THE RESERVIOR/PUMP UNIT ANF THE AFT MANIFOLD.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.