KitLog pro

Powered By Kitlog Pro v2.0

DAVID'S WEB SITE
' style=
Date:  5-27-2015
Number of Hours:  15.00
Manual Reference:  7.2.G
Brief Description:  INSTALLING THE AILERON CONTROL SYSTEM

CUT PUSH PULL ROD TO LENGTH.

TABLE 7.2.G.1 OVER ALL LENGTH.

TABLE 7.2.G.2 PUSH PULL ROD IN BOARD.

TABLE 7.2.G.3 PUSH PULL ROD OUT BOARD.

TABLE 7.2.G.4 PUSH PULLROD CENTRE.

INSTALL THE CONTROL STICK.
PLACE CONTROL STICK INTO AILERON TORQUE TUBE.
SECURE WITH BOLT ( AN4-16A) WASHER (AN960-416L) AND LOCK NUT ( AN365-428A)

TIGHTEN SO THAT THERE IS NO SLOP IN THE STICK.
INSTALL THE TORQUE TUBES USING BOLT (AN4-14A) WASHER (AN960-416L) AND NUTS (AN365-428A)

AILERON HARD POINT.
WERE THE TORQUE TUBE CONTACTS THE SKIN AT THE CONTROL STICK LOCATION CREATE A HARD POINT 1 1/2" TO 2". FIG 7.2.G.7
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.