TEE FITTING IN THE LEADING EDGE . D SECTION OF THE HORIZONTAL SATIBILIZER, TO SUPPLY AIR TO THE TAIL BOOTS.
1 LOCATE AND DRILL A 1.125 ACCESS HOLE VERTICALLY THROUGH THE HORIZONTAL STABILIZER ON THE AIRCRAFT CENTRLINE , AS FAR FORWARD IN THE D SECTION AS POSSIBLE. ROUTE SUPPLY HOSE THROUGH THIS HOLE TO TEE ASSEMBLE.
2 ASSEMBLE TEE AN917-2 WITH 3 N840-6D ADAPTERS
3 CONNECT ONE SIDEOF THE TEE ASSEMBLY TO A BOOT USING EXTRA 3/8 HOSE, LEAVING EXCESS HOSETO ALLOW TEE TEE FITTING TO BE PULLED TO OPPOSITE HORIZONTAL AND CONNECT TO THE OPPOSITE TAIL BOOT.
4 ONCE BOOTS ARE CONNECTED THE FEED LINE CN BE CONNECTED.
5 ROUTE HOSE FROM HARDWARE ASSEMMBLY THROUGH THE REAR EMPANAGE ( FIG 31.2.H.2 ) AND UP THROUGH THE NEW HOLE ( DRILLED IN STEP ONE) IN THE HORIZONTAL STAB .