KitLog pro

Powered By Kitlog Pro v2.0

DAVID'S WEB SITE
' style=
Date:  5-16-2015
Number of Hours:  4.00
Manual Reference:  4.2.H.4
Brief Description:  RUDDER PEDAL SIDE BRAKET INSALLATION

DETERMIN THE LOCATION OFF SIDE BRAKET.

METHOD B.

MATCH DRILLTHE BRACKET TO A G-10 OR PHENOLIC PAD.
INSERT TWO SCREWS AND MAKE A HARD POINT.

REF TO CHAPTER 2 INTRODUCTION TO MATERIALS AND PROCESSES.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.