Powered By Kitlog Pro v2.0
DAVID'S WEB SITE
Evolution
All
4-7-2015
< Previous Log Entry
Next Log Entry >
Date:
4-7-2015
Number of Hours:
2.00
Manual Reference:
3.2.C
Brief Description:
INSTALL HORIZONTAL STAB HINGES
INSTALL FOUR HINGE HALFS ON TO THE ELEVATOR ASSENBLY (150-0047)
FIG 3.2.C.1.
PLACE THE ELEVATOR INTO THE ELEVATOR POCKETOF THE HORIZONTAL, ALIGN THE BOLT HOLES IN THE HINGE.
INSERT THE BOLTS (AN3-6A) AND WASHERS (AN960-10L) AND TORQUE TO 25 IN LBS.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Evolution Home
Category
# Logs
# Hours
All
227
1207
10 fuselage
14
113
11 hyd sys
19
125
12 fuel sys
8
42
13 brake sys
9
34
14 seat/saet belts
11
41
15 main door
12
23
16 heat/vent/air con
11
56
17 baggage door
8
38
18 pitot static
1
8
19 elec and avionics
14
57
20 auto pilot
4
22
21 nose gear
14
68
3 horizontal stab /
19
232
31 ice rain protecti
10
73
4 rudder
16
62
5 wings
20
90
6 flaps
5
7
7 aileron
11
50
8 landing gear
12
37
9 gear doors
4
25
duplicate inspection
1
4
Shop Supplies
4
Copyright © 2001-2024 Matronics. All Rights Reserved.