INSTALL STATIC WICKS UNDER THE UNDERSIDE OF THE LEFT AND RIGHT ELEVATORS. STATIC WICK MUST BE INSTALLED ONTO BARE CARBON FIBER. PREP SURFACE WITH 80 RRIT SANDPAPER. CLEAN AREA WITH ACETONE. BOND MOUNTING BRACKET TOUNDER SIDE WITH HYSOL. AFTER CURING PAINT WITH CONDUTTIVE PAINT. REF FIGURE. 3.2.O.1 FOR LOCATION