KitLog pro

Powered By Kitlog Pro v2.0

DAVID'S WEB SITE
' style=
Date:  5-16-2015
Number of Hours:  4.00
Manual Reference:  5.2.N
Brief Description:  GROUNDING THE FUEL FLANGES AND STATIC WICKS

FUEL CAP GROUNDING.
LOCTE AND DRILL THREE HOLES 120 DEGREES APART AROUND THE FLANG AND A 5/15 OUTWARD FROM THE FLANGE INNER EDGE TO THE CENTRE HOLE.

COAT EACH HOLE WITH CONDUCTIVE PAINT.

INSERT SCREWS WHILE PAINT IS STILL WET.COAT WASHER AND NUT WITH FLOX, INTSALL. APPLY CONDUCTIVE PAINT UNDER SCREW HEAH PRIOR TO FINAL TIGHTENING.
PREP CONTINUOUS PATH ON WING SURFACE TO FUEL FLANGES WITH 80 GRIT ABRASIVE PAPER. PATH SHOULD BE 6 " WIDE MINIMUM.

CLEAN ALL AREAS WITH ACETONE.APPLY TWO COATS OFF CONDUCTIVE PAINT.

ENSURE ALLEXCESS PAINT IS REMOVED FROM WORKING SURFACE OFF FUEL FLANGE.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.