Cleaned up entire work area, copied pages for flap constructions, gathered notes from left flap assembly. Clecoed FL-906B-R to fab rib and clamped to FL906A angle. Everything firmly clamed and clecoed. Drilled out #30 holes (4-x rivets) on 906 A&B. 10 holes.