KitLog pro

Powered By Kitlog Pro v2.0

Murlins Web Site
' style=
Date:  1-8-2015
Number of Hours:  1.50
Manual Reference:  7-13
Brief Description:  Begin / re start right flap

Cleaned up entire work area, copied pages for flap constructions, gathered notes from left flap assembly.
Clecoed FL-906B-R to fab rib and clamped to FL906A angle. Everything firmly clamed and clecoed.
Drilled out #30 holes (4-x rivets) on 906 A&B. 10 holes.
' style=

Clamped and Clecoed

Clamped and Clecoed

' style=

Aligned

Aligned

' style=

Drilled.

Drilled.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.