KitLog pro

Powered By Kitlog Pro v2.0

Murlins Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  7-25-2013
Number of Hours:  3.00
Manual Reference:  7-1
Brief Description:  Build frame / install posts for wing spar

Installed 4x4 posts. One was glued to floor and screwed to ceiling (bracing boards screwed into ceiling joists). Second post was tied, using 2x4, to original post and wall.
' style=





' style=




' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.