KitLog pro

Powered By Kitlog Pro v2.0

Murlins Web Site
' style=
Date:  5-3-2013
Number of Hours:  1.50
Manual Reference:  6-9
Brief Description:  Clamp and drill trim tab hinge to elevator

Cut small bocks of wood to wedge loose hinge to elevator spar - worked well and kept things well lined up.
Used spare piece of hinge material to line up / measure gaps; drilled one hole on each end to set line, then drilled holes in between.
Drilling went well with no problems.
' style=

Spare hinge material to measure gap

Spare hinge material to measure gap

' style=

First hole and cleco

First hole and cleco

' style=

All holes drilled and clecoed

All holes drilled and clecoed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.