Powered By Kitlog Pro v2.0
Murlins Web Site
RV9A
Empennage
4-28-2013
< Previous Log Entry
Next Log Entry >
Date:
4-28-2013
Number of Hours:
0.50
Manual Reference:
6-9
Brief Description:
Drill out end holes in trim tab to #30 and dimple
Clecoed the spar to the skin (to hold everything still) and drill to #30 holes on both sides.
Drilled, cleaned, and dimpled.
Clecoed to test fit.
Clecoed and ready to drill
Drilled and dimpled
#30 clecoed to test fit
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV9A Home
Category
# Logs
# Hours
All
546
1122
Ailerons
36
73
Delivery
1
3
Empennage
232
470
Flaps
61
114
Inventory
8
30
Miscellaneous
3
12
Practice Projects
2
5
Wings
203
415
Copyright © 2001-2024 Matronics. All Rights Reserved.