KitLog pro

Powered By Kitlog Pro v2.0

Murlins Web Site
' style=
Date:  2-24-2012
Number of Hours:  2.00
Manual Reference:  6-1
Brief Description:  Prepare main ribs and Nose ribs

Deburred ribs, clecoed to check alignment.
fluted, as necessary to straighten.
Called Vans tech support to verify process - originally interpreted directions as making edge of ribs straight(i.e. flat) in respect to the spars. Tech support pointed out the word 'straight' as in all the pre drilled holes were lined up. BIG difference. Caution to understand words meaning as intended. Process was saved by attaching all ribs to front and rear spar - verified it was not possible to make them flat - that's when I called tech support. Learned!
' style=

verify position and fit

verify position and fit

' style=

straight ribs

straight ribs

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.