Powered By Kitlog Pro v2.0
Mike Miller
CH 601XL B
Fuselage
3-19-2008
< Previous Log Entry
Next Log Entry >
Date:
3-19-2008
Number of Hours:
4.00
Manual Reference:
Brief Description:
Center Console
Finished drilling to A5 on center arm rest.
Prep and Zinc all "L" 's for center arm rest. (which doubles as a tunnel for torque tube) Also a path for elevator cables and rudder cables.
Removed seat back to rivet side braces that can not be riveted after installed. Have re-installed seat back. (This was a bear! )
As expected, I need to rivet a few things on fuse. that can't be done later. (Lots to rivet from bottom of plane.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH 601XL B Home
Category
# Logs
# Hours
All
434
1220
Empennage
54
146
FTT
5
14
Fuselage
141
400
Miscellaneous
10
9
None
3
13
Shop Supplies
10
46
Wings
211
592
Copyright © 2001-2024 Matronics. All Rights Reserved.