Brief Description: Added all forward longerons and bulkheads
After several days of hard work crawling on the floor and reaching over the side I was able to wrap up the fitting and drilling of the longerons and bulkhead. Having a pillow for my knees made the job more bearable.
Other builders recommended adding an angle brace to the arm rests.