KitLog pro

Powered By Kitlog Pro v2.0

MIKE'S WEB SITE
' style=
Date:  7-29-2020
Number of Hours:  4.00
Manual Reference:  10-05, -07
Brief Description:  Match and final drilled bulkhead and tie down to

I pulled out the VS to assemble the bulkhead and tie down bracket to it IOT final and match drill some holes. The plans also call for dimpling all the #30 holes in the bulkhead but there are two that shouldn't be dimpled since they sit under the tie down bracket.
' style=

Don't dimple

Don't dimple

' style=

Drilling tie down bracket

Drilling tie down bracket

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.