Date:  12-16-2012
Number of Hours:  4.00
Manual Reference:  10
Brief Description:  Wing Preperation

Finally got back to the trim tap for the elevator, solved the deflection issue perfectly, have now over 30deg +- deflection with a decent control horn.

Which required a new servo with bigger travel, simple ($145.-)?
Also glued the push rod scube on.

Cutting the landing light cover was a bit tricky as they were just on the smaller side pre-cut! A bit bigger would be a nicer fit.
Got also the bearings and the flaps installed and work on the leading edge of the flap needs some filling to make it round and straight.