KitLog pro

Powered By Kitlog Pro v2.0

Michaels Web Site
' style=
Date:  12-10-2022
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Fuel Calibration

Placing the airplane on level ground and starting fulling the tank with 5l of fuel increments left and right alternating after the fuel sender was reset with the help of an endoscope camera. After the sender zero I started filling and measuring the tank level at the same time. My wife took notes as the tank was filling up.
As we found both tanks were not the same but the filling curve simillar, also the first 10l are not measurable.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.