KitLog pro

Powered By Kitlog Pro v2.0

Michaels Web Site
' style=
Date:  5-18-2019
Number of Hours:  4.00
Manual Reference:  40
Brief Description:  Preperation for Toe Setting

Time has come to set the Toe on the main gear. First I had to remove the break calibre so that I could attached two straight edges to the brake discs as per earlier manual.
Having the air plane level and a laser level through the centre, measuring the wheel alignment with zero Toe with max weight in the cockpit, used a few bags of cement to simulate wings and pilot!
To align the wheels a lot of measuring and twisting of the leg was required.
To my surprise the weight had not changed the toe setting!
' style=

Laser line through the centre

Laser line through the centre

' style=

Straight edge on brake disc

Straight edge on brake disc

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.