KitLog pro

Powered By Kitlog Pro v2.0

Garys RV-7 Builders Log
' style=
Date:  11-2-2013
Number of Hours:  3.00
Manual Reference:  8-12
Brief Description:  Seat floor work

Today, I riveted the hinge halves to the seat floors using the Cleaveland C-frame and my extended back rivet set. I then painted the top of the seat floors.

Later in the afternoon, I fabbed the F-741B tunnel cover. I then fabbed the F-741A (L) tunnel support. I still need to drill the mounting holes and fab F-741A(R).
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.