KitLog pro

Powered By Kitlog Pro v2.0

Garys RV-7 Builders Log
' style=
Date:  8-18-2013
Number of Hours:  2.00
Manual Reference:  8-11
Brief Description:  Elevator bell crank work

Today, I finally got back on the project after Oshkosh and a great family vacation to Traverse City.

First, I made the two F-635C spacers for the elevator bellcrank assembly, I then drilled the hole to size and test fit the assembly and removed.

Next, I drilled the F-656 gussets to the longerons and F-707 and F0708 bulkheads. The gussets were then prepped and primed.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.