KitLog pro

Powered By Kitlog Pro v2.0

Garys RV-7 Builders Log
' style=
Date:  12-26-2012
Number of Hours:  4.00
Manual Reference:  8-8
Brief Description:  Match drilled F-902 forward bulkheads.

Today I started by match drilling the left F-684 gusset. I am close to the limits for edge distance for both of these gussets and plan to ask Gerry to stop by and take a look. Next, I deburred, fitted, and match drilled the F-902 forward bulkheads. I also drilled the two 5/8" rudder cable holes and riveted two nutplates to each F-902. I then clecoed both F-7101 gear attach webs in place and match drilled them to each F-902 bulkhead. The top and bottom tabs of the bulkheads were also drilled and clecoed.
' style=

F-684 fitted, drilled, and clecoed.

F-684 fitted, drilled, and clecoed.

' style=

F-902 bulkhead and F-7101 gear web.

F-902 bulkhead and F-7101 gear web.

' style=

Left side (inverted) forward fuselage.

Left side (inverted) forward fuselage.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.