KitLog pro

Powered By Kitlog Pro v2.0

Garys RV-7 Builders Log
' style=
Date:  9-19-2012
Number of Hours:  1.25
Manual Reference:  8-7
Brief Description:  Fabbed F-704-L

Tonight I fabbed the (4) F-704-L straps and match drilled them in place on the F-704 bulkhead and longerons. Next session I will set the firewall in place.
' style=

F-704-L Straps match drilled

F-704-L Straps match drilled

' style=

F-704-L Strap match drilled

F-704-L Strap match drilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.