Powered By Kitlog Pro v2.0
Garys RV-7 Builders Log
RV-7
Fuselage
9-19-2012
< Previous Log Entry
Next Log Entry >
Date:
9-19-2012
Number of Hours:
1.25
Manual Reference:
8-7
Brief Description:
Fabbed F-704-L
Tonight I fabbed the (4) F-704-L straps and match drilled them in place on the F-704 bulkhead and longerons. Next session I will set the firewall in place.
F-704-L Straps match drilled
F-704-L Strap match drilled
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
659
880
Airplane and Flying
35
All Things Aviation
35
Avionics
2
Empennage
110
161
Family and Non-Aviat
10
Finishing Kit
2
2
Fuselage
300
530
Miscellaneous
2
Paint Related Items
6
Practice
6
Shop Set Up
18
Tools
19
Wings
114
187
Copyright © 2001-2024 Matronics. All Rights Reserved.