KitLog pro

Powered By Kitlog Pro v2.0

Garys RV-7 Builders Log
' style=
Date:  5-29-2012
Number of Hours:  2.00
Manual Reference:  8-6
Brief Description:  Bolted F-704 bulkhead halves together.

Tonight I finished the fourth spacer and then bolted the F-704 bulkhead halves together. I then reamed the forward bottom skin/F-704 holes to #40 and countersunk the four holes as called out for the floor stiffeners. Then, I match drilled most of the holes in both F-704H's. Diane and Justine hung out in the shop which was cool.
' style=

F-704H match drilled to bulkhead halves.

F-704H match drilled to bulkhead halves.

' style=

F-704 bulkhead bolted with spacers.

F-704 bulkhead bolted with spacers.

' style=

F-704 bulkhead front view.

F-704 bulkhead front view.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.