Tim's MTO Gyro Build
MTO Sport 2017
1.1150 Main Harness
1-11-2019
< Previous Log Entry
Next Log Entry >
Date:
1-11-2019
Number of Hours:
3.50
Manual Reference:
Brief Description:
Installed harnesses
Installed harnesses:
Ran electrical harness, PN harness, antenna cable thru frame
Connected PN lines to trim cylinders at roor head
Zip tied wiring harness to frame
Connected ground wire and solenoid control wire
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
MTO Sport 2017 Home
Category
# Logs
# Hours
All
76
141
0.000 Unpack and Inv
1
4
1.100 Frame Prep
2
2
1.1000 Pushrod Assy
2
2
1.1100 Pedals
1
2
1.1150 Main Harness
3
6
1.1200 Thr/Ch cables
2
6
1.1300 Seats & Belts
3
8
1.1375 Rear Throttle
2
2
1.1400 Fuel System
5
8
1.1500 Battery/Fuse
1
2
1.200 Rear Undercarr
1
2
1.300 Rear Wheels
1
1
1.400 Nosewheel
2
1
1.500 Mast Top
2
3
1.600 Control Shaft
2
4
1.700 Rudder Cont
3
4
1.900 Rotor Head
2
3
1.950 Pneu Trim Cyl
1
0
2.100 Engine clutch
3
4
2.200 Engine Assy
4
16
2.300 Drive Shaft
1
0
3.100 Front cover
3
8
3.300 Baggage
2
2
3.400 Cockpit
2
6
3.500 Throttle/brake
2
6
3.625 Propeller
1
1
3.650 Ground run
2
5
3.675 Cockpit final
4
10
3.700 Seat cushion
3
6
3.800 Windscreen
1
2
4.050 Strobes
1
0
4.100 Tail plane
1
2
4.200 Rear cover
2
4
4.400 Tube handle
1
2
4.500 Wheel farings
1
1
4.700 Placards
1
0
999 Final pre-flight
5
6
Copyright © 2001-2024 Matronics. All Rights Reserved.