Matt's RV-8 Project



Matt Dralle's RV-8 Project
' style=
Date:  5-27-2015
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Pitot & Static Testing - Part 1

Precision Static and Calibration came out to do an IFR pitot/static test this afternoon. Went through the GRT HX dual AHRS calibration and checkout. System had zero leaks and was within 0 to 5 ft across 0 to 30000 ft. Woo hoo! One less thing before the test flight!
' style=

Pitot & Static Testing

Pitot & Static Testing

' style=

Pitot & Static Testing

Pitot & Static Testing

' style=

Pitot & Static Testing

Pitot & Static Testing

' style=










Copyright © 2008-2024 Matt Dralle. All Rights Reserved.