Matt's RV-6 Project



Matt Dralle's RV-6 Project
' style=
Date:  9-12-2011
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Mounting The New Equipment

The first step in the revitalization of The Flyer was to start mounting all the new equipment. Boxes of note included the VP-200 Control Unit (basically the electrical system in a big Red box), the Dynon EMS (Engine Monitoring System), the new Mode S transponder module, and a few other things. Its kind of amazing, really, how much simpler things are with modern electronics. Still, lots and lots of wires to be added and terminated...
' style=

Ready For New Equipment

Ready For New Equipment

' style=

New Equipment Mounted

New Equipment Mounted

' style=










Copyright © 2008-2024 Matt Dralle. All Rights Reserved.