KitLog pro

Powered By Kitlog Pro v2.0

Patto Web Site
' style=
Date:  12-31-2009
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Preparing the landing light and mount

Drilled the clear cover for the landing light - after heating the sheet so it wasn't brittle (though the air tempurate was close to 40 today - I still heated the sheet to make sure of no splitting). Then match drilled the mount. Then used 3/32 countersunk alloy rivets to locate the nut plates behind the mount so the clear sheet could be screwed into place.
' style=

Heating the clear sheet

Heating the clear sheet

' style=

Drilling with a drill bit with the back rake angle removed

Drilling with a drill bit with the back rake angle removed

' style=

Match drilling the light mount

Match drilling the light mount

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.