Date:  6-1-2013
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Continued tidying of the electrics

Good run today. Finished grouping all the cables on the back of the panel - then rerouted cables away from the edges of the panel (they were fouling the edge when installing the panel). Then taped the bundeled cables into a harness.

Then moving into the plane to do the same work with all the matching cables in the plane. Strated by grouping them to match the panel connectors - then extended some and shortened others so the cables collected tidily to be joined into the group connectors. Completed the positive power side today (1 x 8 pin and 1 x 2 pin connectors).

UPS tracking says the propeller has passed through Singapore - so it should be here on Tuesday!
' style=

Grouped connector (8 pin)

Grouped connector (8 pin)

' style=

Panel ready ....

Panel ready ....

' style=

Starting work on the aircraft side.

Starting work on the aircraft side.