KitLog pro

Powered By Kitlog Pro v2.0

Patto Web Site
' style=
Date:  4-25-2013
Number of Hours:  9.00
Manual Reference:  
Brief Description:  Panel prep.

A long day chasing down the last of the wiring. Peter T was working on his plane 2 hangars down so I picked his brain multiple times to interpret all of the wiring diangrams and instructions. Had to wire up a 9 pin plug - very fiddly soldering - took 2 hours to get it right. Did all the final connections (chasing wiring and fitting connectors).
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.