KitLog pro

Powered By Kitlog Pro v2.0

Patto Web Site
' style=
Date:  8-13-2010
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Getting the wings and control surfaces ready for p

More filling and sanding. Got to stop some time, but each time a surface is filled and sanded I can find more holes or uneven surfaces. Worth doing but has taken many week's work now.
' style=

Removing elevator bracket.

Removing elevator bracket.

' style=

Re-checking the fit of the elevator trim tab.

Re-checking the fit of the elevator trim tab.

' style=

Sanding, sanding & more sanding.

Sanding, sanding & more sanding.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.