Powered By Kitlog Pro v2.0
MARTIN'S WEB SITE
RV-12 iS
Empennage
12-23-2007
< Previous Log Entry
Next Log Entry >
Date:
12-23-2007
Number of Hours:
5.00
Manual Reference:
Corrosion Control
Brief Description:
Prepare Rudder Skeleton with EkoEtch
Prepare Rudder Skeleton with EkoEtch.
Painted surfaces with SS Smoke Gray Primer/Sealer. Will rivet the structure after plenty of time for Primer/Sealer to dry.
Began to prepare elevator stiffeners. Cut to length and layout material for removal.
Will work very carefully because of different lengths of stiffeners due to trim tab on the LH Elevator.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-12 Home
RV-12 iS Home
Category
# Logs
# Hours
All
141
1354
Empennage
72
728
Flight Controls
2
7
Fuel Tanks
3
29
Miscellaneous
3
44
None
4
14
Static Discharge Sys
3
9
Wings
54
523
Copyright © 2001-2024 Matronics. All Rights Reserved.