KitLog pro

Powered By Kitlog Pro v2.0

MARTIN'S WEB SITE
' style=
Date:  12-23-2007
Number of Hours:  5.00
Manual Reference:  Corrosion Control
Brief Description:  Prepare Rudder Skeleton with EkoEtch

Prepare Rudder Skeleton with EkoEtch.

Painted surfaces with SS Smoke Gray Primer/Sealer. Will rivet the structure after plenty of time for Primer/Sealer to dry.

Began to prepare elevator stiffeners. Cut to length and layout material for removal.

Will work very carefully because of different lengths of stiffeners due to trim tab on the LH Elevator.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.