Brief Description: Fuselage- various repair and sub-assemblies
This Saturday, I did:
- Finalize disassembly of Fuselage Center Section to replace the bulkhead F804C-AL - Install, Cleco and Rivet the new replacement F804C-AL and the block F804G - Reassemble the Center Section as it was before - After this repair was done, I move my attention to complete nutplate installation on various sub-assemblies. I just received an order with new nutplate stock from Aircraft Spruce - I installed nutplates on F818B-L-1 & F818B-R-1 (per the modification I did to ensure the bagage floor is removable for inspection) - I riveted both F818B LH& RH on their respective F818-L-1 & F818R-1 bagage ribs - I completed the battery tray sub-assembly - Installed nutplates, 10 on each longerons (for removable bagage floor mod) on each mid longeron F888. - Cleared the large assembly table and lay the F824 sideskin on it